Explore our completed and ongoing utility-scale solar I&C, tractor-auger foundation piling, MCR/ICR control rooms, HT cabling, and robotic O&M deployments. Click View Details on any project to inspect its complete engineering scope.
CIVIL & PILING
12+ Control Buildings
Industrial-grade interior/exterior protective painting, roof waterproofing, trench covers, and safety signage for solar control buildings.
SOLAR O&M
80+ MW Solar Assets
Tractor-mounted water tanker module washing with TDS-controlled water, grass/vegetation cutting (Flori), and earthing pit maintenance.
CIVIL & PILING
45+ KM Perimeter Fencing
Heavy-duty galvanized chain-link fencing, Y-angle barbed/razor wire concertina topping, MS security gates, and peripheral solar street lighting.
SOLAR I&C
85,000+ PV Modules Mounted
High-speed, trade-validated crew executing multi-MW PV module mounting, earthing continuity jumpers, and string interconnection.
SOLAR I&C
350+ KM AC/DC/HT Cabling
Mechanized drum pay-off, underground trenching, sand-brick cushioning, and calibrated Megger testing for HT/LT AC and DC solar cables.
SOLAR O&M
120+ MW Under Active O&M
Waterless automated robotic panel cleaning and scheduled preventive maintenance delivering 99.4%+ Plant Availability and boosted PR.
CIVIL & PILING
MCR + 8 ICR Stations
Heavy RCC civil construction of Main Control Rooms, Inverter Stations, cable trenches, transformer plinths, and blast walls.
CIVIL & PILING
18,500+ Foundation Piles Cast
Rapid vertical soil boring up to 2.5m-3.0m depth using owned tractor-mounted hydraulic augers and M25/M30 grade concrete pile casting.
SOLAR I&C
50+ MW Utility Solar Block
Complete mechanical MMS assembly, seasonal/fixed-tilt module mounting, DC string routing, and central inverter commissioning across multi-MW solar parks.